rb-consult IT-Projekte

References

Customer: WestLB AG

Time: 03.04 -
Project: Projekt MPVaR bei der WestLB AG in Düsseldorf. Risk- Management- Lösung für Aktien- und Commodity- Risiken.
IT Environment: Java, PL- SQL, JBoss, JEE 5, XP, Unix, Oracle
Tasks: Development of client- software in Java to maintain risk- models, backtesting, stresstesting. Development of Data- Warehouse- components for external data sources (Summit, Prime, Apollo) using Java and PL-SQL. Integration of Reuters- and Bloomberg- feeds. Development of workflow components.

Customer: WestLB AG

Time: 08.00 - 02.04
Project: Projekt MPiRE (Market Price Risk Engine) for risk- management- department of WestLB AG Düsseldorf.
IT Environment: Java, PL- SQL, NT, Unix, Oracle
Tasks: Development of client- software in Java/Swing to maintain risk- models, backtesting, stresstesting and manual sensitivities

Customer: Deutsche Post AG

Time: 10.99 - 07.00
Project: Development of a ERP (production planing system) for the mail distribution centers of the 'Deutsche Post AG' (german mail company)
IT Environment: C++, Java, PL- SQL, Unix, Oracle
Tasks: Process design and development with C++, Embeded SQL, PL- SQL, Java- prototyping

Customer: Toyota Kreditbank GmbH

Time: 10.98 - 10.99
Project: Development of a workflow system managing the partpaid and leasing business for the 'Toyota Kreditbank GmbH' (bank of a car manufacturer)
IT Environment: SmallTalk, OS/2, Unix, Informix, DB/2
Tasks: SmallTalk development, business process design

Customer: VW AG

Time: 10.99 - 12.99
Project: Analysis and development of a prototype for replication of CAD- data for the 'VW AG Wolfsburg' (car manufacturer)
IT Environment: (Embedded, PL-) SQL/C, Irix, Oracle
Tasks: Adviser for database design and replication

Customer: O.tel.o Telekommunikations GmbH

Time: 02.98 - 09.98
Project: Report development for examination the net topologies of the 'O.tel.o Telekommunikations GmbH' (telecommunication provider)
IT Environment: Developer 2000, Oracle
Tasks: Report development

Customer: PSI AG

Time: 11.97 - 02.98
Project: Specification and implementation of an interface layer between SAP/R3 WM and an stock management system for 'PSI AG' (software company)
IT Environment: C++, PL- SQL, HP-UX, Oracle
Tasks: Design, Development

Customer: Thyssen Schulte Werkstoffe GmbH

Time: 09.97 - 11.97
Project: Analysis for a stock management system handling Coils for the 'Thyssen Schulte Werkstoffe GmbH' (steel trading company)
Tasks: Specification

Customer: TKN GmbH (Tchibo, Kühne u. Nagel)

Time: 12.95 - 09.97
Project: Development of a logistic system for a automated logistic center(coil red tape system, board distribution) for the'TKN GmbH' (Tchibo, Kühne a. Nagel) (distributor of coffee an non food)
IT Environment: C/C++/Centura, PL- SQL, HP-UX/Windows, Oracle
Tasks: team leadership , design, processing, development

Customer: Phillips Kommunikations Industrie AG

Time: 01.94 - 02.95
Project: Reengineering of a net control system for telecomunication provider for 'Phillips Kommunikations Industrie AG, Nürnberg' (manufacturer of hardware for telecomunication provider)
IT Environment: C, OS/2, Sybase
Tasks: Database design, database administration

Customer: Municipality of Aachen

Time: 09.92 - 01.94
Project: Development of a enviromental information system AISA (soil, water) for ' Umweltamt der Stadt Aachen' (environment authority of the City of Aachen)
IT Environment: C++, PL- SQL, OS/2 AIX, Oracle
Tasks: Project management, design, development

Customer: Municipality of Dortmund

Time: 03.92 - 09.92
Project: Development of a waste information system for the 'Umweltamt der Stadt Dortmund' (environment authority of the City of Dortmund)
IT Environment: Ingres 4GL, OS/2 AIX, Ingres
Tasks: Analysis, design, development

Customer: Bundesanstalt für Arbeitsschutz

Time: 10.91 - 02.92
Project: Development of a distributed multimedia archive for the 'Bundesanstalt für Arbeitsschutz' (health security authority for employees)
IT Environment: SmallTalk/C, Windows/Unix
Tasks: Development

Customer: Municipality Duisburg, Municipality Dortmund, Municipality Hamm, Hygiene- Institut Gelsenkirchen, Ilmed GmbH, Pharma Chemie Munic

Time: 06.87 - 10.91
Project: Development of several workflow systems for laboratories for chemistry and medical research (City of Duisburg, City of Dortmund, City of Hamm, 'Hygiene- Institut Gelsenkirchen', 'Ilmed GmbH',' Pharma Chemie München')
IT Environment: C/C++/Embedded SQL, Unix, DDB4/Ingres/Oracle
Tasks: Project management, analysis, design, development, main tasks differed in projects

Customer: Staatliches Materialprüfungsamt NRW

Time: 10.86 - 06.87
Project: Laboratory workflow, data logging and analysis for the 'Staatliches Materialprüfungsamt Dortmund' (govermental institute for material testing)
IT Environment: Pascal, RSX(PDP11)
Tasks: Development, commencement

Customer: Bildungswerk DAG

Time: 08.86 - 11.86
Project: Research in college "Modellierung des Strömungsverhaltens in blasengerührten Reaktoren" (Modell for streaming flows of fluids in bubble driven reactors) (Technical University of Berlin)
IT Environment: Pascal, HP und BS2000
Tasks: data logging and processing , calculation of flow models

References:

Untermenüauswahl